Checking in with everyone.
We have started the remodel in our downstairs bathroom. We got all the wallpaper off the walls, cleaned the walls, spackled and hubby painted. He put in a new light and mirror. He replaced the drywall above the shower surround and that will be tiled later when the floor gets tiled. We have arranged for a new vent fan and light in the shower, a new toilet and a new spicket on the sink. We have someone coming in to do that. He will also put in the new windows which is the bay window with a window on each side that can open. The dining room windows (2 side by side) and the two kitchen windows which are corner windows. Then he is going to replace the door coming in the house from the garage.
We got hubby a new to us dresser for the bedroom since he and I share the full closet and that isn't enough. We've purchased the fertilizer for the spring, summer, and fall. We're having an electrician come over to figure out why the 220 volt died in the barn leaving us with 110 only. The furnace out there doesn't work so we want that replaced and soon I need to call the underground sprinkling company to arrange for a start-up and make sure that works.
At least we have the plan in place and a few things started, we now just wait for when the builder can come to do some of things only he can do. Kind of exciting even though all I can see are dollar signs!
Alice